中国第一座采用原矿焙烧工艺的紫木凼金矿黄金冶炼厂经过7年的运行,基本达到了设计生产能力。但由于设备老化,焙烧效果不好,金浸出指标下滑,再加上近年来原矿金品位下降,致使企业经济效益降低。通过对沸腾焙烧炉、气-气换热器、旋风收尘器、炉前风机和尾排风机、尾气吸收系统的改造,使金回收率大幅提高,各项指标得以改善,从而使该工艺更趋完善。

Zimudang gold smeltery ,the first smeltery applying whole ore roasting in China ,has been running for 7 years and roughly reaches the designed capacity .But with the problems like aging equipment ,bad roasting effect ,de-creasing leaching rate as well as the grade decline in gold ores ,profits of enterprises are becoming scarce and produc-tion seems hard to sustain .Gold recovery rate is increased by the optimization of fluidized bed roaster ,air-air heat ex-changer ,rotoclone collector , stoke hole fan and exhaust blower , and off-gas collection system .Each indicator is en-hanced making the process more complete .

参考文献

[1] 董常平;金世斌;汪丹 等.原矿沸腾焙烧工艺试验报告[R].长春:长春黄金研究院,2003.
[2] 张清波;汪丹;鲁玉春 等.原矿焙烧提金工艺工程化研究与应用技术报告[R].长春:长春黄金研究院,2008.
[3] 王云;袁朝新 .中信金属公司代表团赴美考察报告[R].北京:北京矿冶研究院,2010.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%