对于岩金矿山而言,选矿厂是一个自动化控制技术应用相对较高的场所,自动化控制技术的应用,极大地提升了岩金矿山选厂整体科技装备水平。以白云金矿一选厂扩建工程为实例,详细介绍了选矿工艺流程自动化控制过程,可为类似工程设计时参考。
For rock gold mines ,the ore-dressing plant has relatively high deployment of automation control tech-nology.On the other hand ,the deployment of automation control significantly improves the overall equipment level of technology .The paper takes one ore-dressing plant in Baiyun Gold Mine for example ,elaborates the process of automa-tion control operation which is referable for other mines with similar conditions .
参考文献
[1] | 蔡明明,王金法,林海,曲洪俊,殷清,宋小伟.磨矿分级自动化在鑫汇矿业公司的应用[J].黄金,2013(11):43-45. |
[2] | 郭雷;程代展;冯德兴.控制理论导论[M].北京:科学出版社,2005:3-16. |
[3] | 黄忠霖.控制系统MATLAB 计算及仿真[M].北京:国防工业出版社,2001:4-18. |
[4] | Corbet J;Rubini A;Kroah -Hartman G.Linux Divice,Drivers 3th[M].Sebastopol:O'Reilly,2005:3-9. |
[5] | ARM Corporation.ARM920 Technical Reference Manual[M].Cam-bridge:ARM Corporation,2001:30-50. |
[6] | Philips Semiconductors Corporation.the llc-BUS Specification[M].Eindhoven:Philips Semiconductors Corporation,2000:16-20. |
[7] | Compact Flash Association.CF and CompactF:lash Specification[M].Cupertino:Compact Flash Association,2003:12-30. |
[8] | 希祥.碎矿与磨矿[M].北京:冶金工业出版社,2006:12-30. |
上一张
下一张
上一张
下一张
计量
- 下载量()
- 访问量()
文章评分
- 您的评分:
-
10%
-
20%
-
30%
-
40%
-
50%