所有岩土工程都在岩体中进行,岩体的稳定性受到岩体质量好坏的制约,进行岩土工程设计与施工要根据岩体的质量评价和其结构特征。山后金矿主矿体赋存于招平断裂带下盘,上盘断层泥极容易冒落,目前没有巷道穿过上盘断层泥;通过钻孔岩心调查与现场节理调查相结合的方式,分析钻孔、现场节理调查数据和节理产状,依据Q系统方法对山后金矿岩体稳定性进行了分级,并对采场的安全性进行了评价,为山后金矿采矿工程设计提供参考。
All geotechnical engineering activities are carried out in the rock mass and the stability of rock mass is restricted by the its quality,so the design and construction of geotechnical engineering should be implemented accord-ing to the quality evaluation of rock mass and its structure characteristics.Shanhou Gold Deposit occurs in the footwall of Zhao-Ping fault,and because the dirt in the hanging wall of the fault is extremely prone to fall,there is no tunnel through the hanging wall for now.Drill holes,field fissure investigation and shape of fissures are analyzed by means of combined drill core survey and field fissure survey,and according to the Q system,rock mass stability of Shanhou Gold Mine is classified and an evaluation for the stope safety is made,providing basis for the design of mining engineering for the gold mine.
参考文献
[1] | 罗钢,蒋楠,周传波.不同围岩分级方法在地下采矿巷道围岩分级中的适用性分析[J].安全与环境工程,2011(06):101-104. |
[2] | 张勇慧,李红旭,盛谦,李志勇,岳志平.基于模糊综合评判的公路岩质边坡稳定性分级研究[J].岩土力学,2010(10):3151-3156. |
[3] | 周志东,胡卸文,张倬元,黄润秋.西南某水电站坝肩岩体质量分级方法选取探讨[J].成都理工大学学报(自然科学版),1999(01):82-85. |
[4] | 张忠.应用岩体稳定性分级预测矿岩的可崩性[J].采矿技术,2005(01):22-25,86. |
[5] | 余伟健,高谦,靳学奇,张周平.受断层构造影响的深部岩体现场调查及力学特征分析[J].地球物理学进展,2013(01):488-497. |
[6] | 康小兵,许模,陈旭.岩体质量Q系统分类法及其应用[J].中国地质灾害与防治学报,2008(04):91-95. |