欢迎登录材料期刊网

材料期刊网

高级检索

为研究露天矿山采剥计划年矿岩总量和矿石量,以某露天金属矿为研究背景,依据锥体排除法生成最优地质开采体,运用动态规划理论对最优开采体进行经济评价,以3Dmine为载体建立采剥计划模型对矿山生产进行数值模拟,并与矿山6年的实际生产数据进行对比分析。研究表明:模拟结果与矿山的实际生产数据基本吻合,运用该模型为矿山预测未来5年的采剥计划。模型得到的采剥计划对该矿山的生产有一定的参考价值,并对其他矿山有借鉴意义。

In order to study the total annual ore-bearing rock and ore quantity of stripping plan in open-pit mines, the paper taking an open-pit metallil mine as the research subject,employs the cone exclusion method to generate the optimal mining geological body which is economically evaluated using the dynamic planning theory.Mine production is numerically simulated by the stripping plan model set up based on 3Dmine,and the results will be subjected to the comparison with actual production data of the past 6 years.Research shows that the simulation results basically agree with the actual production data.The model is used to predict the mining stripping plan of the next 5 years.The strip-ping plan of mine production based on the model provides guidance for the mine and can be referred to by other mines.

参考文献

[1] 赵景昌;陈鹏.露天矿短期采剥计划CAD系统的开发[J].辽宁工程技术大学学报,2006(5):666-668.
[2] 肖英才;王李管;易丽平;汪军.基于DIMINE软件的露天采剥计划编制技术[J].矿业工程研究,2010(4):6-9.
[3] 顾晓薇;胥孝川;王青;刘剑平.金属露天矿生产计划优化算法的改进[J].东北大学学报(自然科学版),2014(10):1492-1496.
[4] 胥孝川;顾晓薇;王青;刘剑平.金属露天矿最终境界优化算法改进[J].东北大学学报(自然科学版),2014(8):1195-1198.
[5] 狄长江;戴晓江;宇文巍.基于3DMine软件的多金属矿山不同露天开采境界优化方法的对比[J].黄金,2015(8):31-35.
[6] 毕春杰;戴晓江;宋小美.某露天铜矿全境界开采规划优化[J].金属矿山,2015(10):33-36.
[7] 文振明.基于块体模型的三维采剥计划软件开发[J].矿业工程,2013(06):68-69.
[8] 蒋权;陈建宏;杨海洋.基于DIMINE软件系统的露天矿境界优化研究[J].金属矿山,2010(9):13-17,37.
[9] 王青;顾晓薇;胥孝川;刘剑平.露天矿生产规划要素整体优化方法及其应用[J].东北大学学报(自然科学版),2014(12):1796-1800.
[10] 易丽平;王李管;肖英才.基于DIMINE软件的露天采剥计划编制技术研究[J].中国钼业,2010(6):12-15.
[11] 杨彪;罗周全;陆广;张旭芳;鹿浩.基于三维仿真和动态评估的露天矿采剥顺序优化[J].科技导报,2011(8):54-57.
[12] 丁威;陈广平.利用Surpac软件打造数字化金属矿山[J].矿业快报,2006(3):11-13.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%