欢迎登录材料期刊网

材料期刊网

高级检索

综述了近期国内外在后张预应力结构灌浆材料加速腐蚀实验方面的研究进展.其中重点阐述了加速腐蚀实验的原理、主要影响因素,讨论了加速腐蚀实验中的不足,提出了相应的改进措施和研究方向.

参考文献

[1] Alvarez G A A,H R Hamilton.Grout bleed tests in vertical and horizontal post-tensioning duets[J].Post-Tensioning Insti-tute Journal,2004,2(1):1.
[2] 张德峰,吕志涛.现代预应力混凝土结构耐久性的研究现状及其特点[J].工业建筑,2000,30(11):1.
[3] 王思源.预应力混凝土孔道灌浆材料及施工工艺改进研究[D].南京:东南大学,2002:9.
[4] 美国后张预应力委员会编.华东预应力中心译.后张预应力混凝土手册[M].南京:东南大学出版社,1990.37.
[5] N G Thompson,D tankard,M Spfinkel.Improved grouts for bonded tendons in post-tensioned bridge structures[J].Cortest Columbus Technologies,1992,2(1):23.
[6] D Lankard,N G Thompson,Y P Virmani.Grouts for bonded post tensioned concrete construction:protecting prestressing steelfrom corrosion[J].ACIMaterials Journal,1993,90(5):406.
[7] 刘海燕,陈开利.用于腐蚀环境下有牯结后张法预应力筋的砂浆[J].世界桥梁,2004,(4):69.
[8] SEEE協会技衍委員会Al分科会.腐食環境下における付着のあるホストンッコョ方式PC鋼材用クラウト[J].プレストレストユンクリ-ト,2002,44(3):48.
[9] Rubén Mario,Salas Pereira.Accelerated Corrosion Testing,E-valuation and Durability Design of Bonded Post-Tensioned Concrete Tendons[D].Austin:The University of Texes,2003.181.
[10] S Ehtesham Hussain Ⅰ,Basheeduzzafar.Influence of mieresillea on protection from chloride-induced corrosion of reinforcing steel[J].Journal of Materials in Civil Engineering,1993,5(2):155.
[11] James Loper,Dennis Sanschagrin.Bonded post-tensioning at BWI airport[J].Concrete Intemational,2003,75(5):105.
[12] H R Hamilton.Investigation of Corresion Protection system for Bridge Stay Cables[D].Austin:The University of Texes,1995.52.
[13] A J Schokker.Improving Corrosion Resistance of Post Ten-sioned Substructures Emphasizing Hish Performance Grouts[D].Austin:The University of Texas,1999.16.
[14] A R Pacheco.Evaluating the corrosion protection of post-tensio-ning grouts:strandardization of un accelerated eorrosion test[D].Austin:The University of Texas,2003.101.
[15] H R Hamilton,H G Wheat,J E Breen,et al.Corrosion testing of grout for post-tensioning duets and stay cables[J].Journal of Structural Engineering,2000,126(2):163.
[16] A J Schokker.Impmving Corrosion Resistance of Post Ten-sioned Substructures Emphasizing High Performance Grouts[D].Austin:The University of Texas,1999.89.
[17] H Homain.J Marchand.V Buhot,ct al.Diffusion of chloride I-ons in limestone filler blended cement pastes and mortars[J].Cement and Concrete Research,1995,25(8):1667.
[18] C Q Li.Initiation of Chloride-Induced reinforced corrosion in concrete structural members.experimentation[J].ACI structur-al Journal,2000,98(4):502.
[19] J Andrade,Dal Molin,Bibeim J L D.A critical analysis of chloride penetration models in reinforced concrete structures[J].Performance and Quality of Concrete Structures,2003,121(3):217.
[20] J Peng.Neural network analysis of chloride diffusion in con-crete[J].Journal of Materials in Civil Engineering,2002,14(4):327.
[21] T J Kirkpatrick.R E weyem,M M Sprinkel.Probabilistie model for the chloride-induced corTosion service life of bridge decks[J].Cement and Concrete Research,2002,32:1943.
[22] S Ahmad.Reinforcement corrosion in concrete structures,its monitoring and service life prediction-a review[J].Cement and Concrete Composites,2003,25(5):459.
[23] S E Hussian,Basheeduzzafar.Corrosion resistance performance of fly ash blended cement concrete[J].ATI Materials Journal,1994,91(3):264.
[24] Kcester.Evaluation of Cement Grouts for Strand Protection u-sing Accelerated Corrosion Tests[D].Austin:The University of Texes,1995.47.
[25] Basheeduzzafar.F H Dakhil.Influence of cement composite on the corrosion of reinforcement and sulfate resistance of concrete[J].ACI Materials Journal,1990,87(2):114.
[26] T Loretz,C French.Corrosion of reinforcing steel in concrete:effects of materials.mix composition,and cracking[J].ACIMaterials Journal,1995,92(2):181.
[27] A F Idriss.S C Negi.Corrosion of steel reinforcement in mortar specimens oxposed to hydrogen sulphide,part 1:impressed voltage and electrochemical potential tests[J].Journal of Agi-cultural Engineering Research.2001,79(2):223.
[28] S Diamond.Alkali silica reactions-some paradoxes[J].Cement and Concrete Composite,1997.19:391.
[29] 高仁辉,秦鸿根,钱培舒.灌浆料加速腐蚀仪的研制与应用,[J].实验技术与管理,2006,23(6):45.
[30] N S Berke.Corrosion Inhibitors in Concrete[J].Concrete In-teraational,1991,13:24.
[31] P Gu,S Elliot.A study of corrosion inhibitor performance in chloride contaminated concrete by electrochemical impedance spectroscopy[J].ACI Materials Journal,1997,94(5):385.
[32] 朱日彰.金属腐蚀学[M].北京:冶金工业出版社,1988.31.
[33] ASTM C939.Standard Test Method for Flow ofGrout for Pre-pieced-Aggregate Concrete(Flew Cone Method)[S].2002.
[34] ASTM c940.StandardTestMethodforExpansionand Bleeding of Freshly Mixed Grouts for Preplaced Aggregate Concrete in the Laboratory[S].2002.
[35] ASTM C1090.Standard test method for measuring changes in height of cylindrical specimens from hydraulic-cement grout[S].1997.
[36] A J Schokker,J E Breen,M E Kreger.Simulated field testing of hish performance grouts for post-tensioning[J].Journal of Bridge Engineering,2002,7(2):127.
[37] N S Berke,D F Shen,K M Sundberg.Comparison of current in-terruption and electrochemical impedance techniques in the de-termination of corrosion rates of steel in concrete[R].Philadel-phia:American Society for Testing and Materials,1990.191.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%