欢迎登录材料期刊网

材料期刊网

高级检索

设计废石尾砂胶结充填工艺模型试验装置,依据采矿工艺、充填工艺原则及工程布置要求,制定废石尾砂胶结充填模型试验方案,运用形态测量及充填体横剖切割揭露等手段进行充填体模型质量评价,确定最佳充填工艺.结果表明,无论是废石均匀铺设还是废石锥形堆放下料方式,废石料与尾砂胶结料浆同步下料时,充填体胶结效果最佳.选择最适宜的充填工艺不仅能有效提高废石尾砂胶结充填体强度,而且能减少水泥用量,节约充填成本.

参考文献

[1] Mathews K;Kaeshagen F.The development and design of a cemented rock filling system at the mount isa mines[A].Victoria,Australia:The Australasian Institute of Mining and Metallurgy,1973:13-23.
[2] Swan G .A new approach to cemented backfill[J].CIM Bulletin,1985,78(8):53-58.
[3] Thomas E G.Characteristics of cemented deslimed mill tailing fill prepared from finely ground tailing[A].Lulea,Sweden:University of Lulea,1983:59-66.
[4] Yu T R.Some factors relating to the stability of consolidated rockfill at Kidd Creek[A].Rotterdam,Netherlands:A A Balkema Publishers,1989:279-286.
[5] Yu T R;Counter D B .Backfill practice and technology at kidd creek mines[J].CIM Bulletin,1983,76:56-65.
[6] Annor A B .A study of the characteristics and behavior of composite backfill material[D].Montreal,Canada:McGill University,1996.
[7] Farsangi P N;Hayward A G;Hassani F P .Consolidated rockfill optimization at Kidd Creek Mine[J].CIM Bulletin,1996,89:129-134.
[8] Landriault D A;Brown R E;Counter D B .Paste backfill study for deep mining at Kidd Creek[J].CIM Bulletin,2000,93:156-161.
[9] 何哲祥;韩志型 .奥托昆普公司矿山充填技术[J].世界采矿快报,1996,12(1):10-13.
[10] 余斌 .非胶结粗颗粒充填体稳定性分析与加固措施[J].中国矿业,1993,2(5):15-17.
[11] 余斌,刘坚,杨和平.粗颗粒充填料渗透性能试验及其影响因素[J].冶金矿山设计与建设,2000(06):7-9.
[12] 陈鼎初 .国内外块石胶结充填技术综述[J].湖南有色金属,1997,13(4):14-18.
[13] 王新民;彭续承 .块石胶结充填工艺的试验研究[J].化工矿物与加工,1996,25(5):16-18.
[14] 郭利杰,余斌.中国金属矿山充填技术与装备的现状和未来[J].采矿技术,2011(03):12-14,37.
[15] 郭利杰,杨小聪.废石尾砂胶结充填试验研究[J].武汉理工大学学报,2008(11):75-78,112.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%