In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research meth- ods are difficult to guarantee the accuracy of the model and successful application to actual applications. The resched- uling problem in response to operation time delay is firstly analyzed. This is then followed by the establishment of a novel multi-obiective nonlinear programming model (MONPM). In specifications, a three-stage rescheduling method is proposed including the batches splitting (BS), forward scheduling method (FSM) and backward scheduling meth- od (BSM). As a result, the real-time application shows that the proposed rescheduling method efficiently ensures the continuous casting and dramatically shortens the redundant waiting time for molten steel in very short rescheduling time.

参考文献

[1] Dario Pacciarelli;Marco Pranzo .Production scheduling in a steelmaking-continuous casting plant[J].Computers & Chemical Engineering: An International Journal of Computer Applications in Chemical Engineering,2004(12):2823-2835.
[2] Missbaucer H;Hauber W;Stadler W .A Scheduling System for the S:eelmakin:Continuous Casting Process.A Case Study From the Steel Making Industry[J].International Journal of Production Research,2009,47(15):4147.
[3] Arezoo Atighehchian;Mehdi Bijari;Hamed Tarkesh .A Novel Hybrid Algorithm For Scheduling Steel-making Continuous Casting Production[J].Computers & operations research,2009(8):2450-2461.
[4] Roy R;Adesola B A;Thornton S .Development of a Knowl edge Model for Managing Schedule Disturbance in Steel Making[J].International Journal of Production Research,2004,42(18):3975.
[5] Dorn J.Case-Based Reactive Scheduling[A].Dordrecht:kluwer Academic Publishers,1995:32.
[6] Jurgen Dorn .Cooperating scheduling systems[J].International Journal of Manufacturing Technology and Management,2001(6):570-585.
[7] Dorn J;Kerr R;Thalhammer G .Reactive Scheduling:Impro-ving Robustness of Schedules and Restricting the Effects of Shop Floor Disturbances by Fuzzy Reasoning[J].International Journal of Human-Computer Studies,1995,42:687.
[8] Worapradya K;Buranathiti T.Production Reseheduling Based on Stability Under Uncertainty for Continuous Slab Casting[A].Bar:gkok:Es.n,2009:170.
[9] GUO Dong fen;LI Tie ke.Rescheduling Algorithm for Steel making Continuous Casting[A].Harbin:IEEE,2007:1421.
[10] LI Tie ke;GUO Dong fen.Constraint-Based Approach for Steelmaking-Continuous Casting Reseheduling[A].Kyoto:Springer,2007:1108.
[11] ZHANG Chun-sheng;LI Tie ke;WANG Bai-lin et al.Dy namic Modeling Method for the Scheduling Problem in Steel making-Continuous Casting With Disturbance of ProductQuality[J].Energy Procedia,2011,13:253.
[12] 俞胜平,郑秉霖,柴天佑.炼钢连铸混合智能调度方法及其应用[J].华东理工大学学报(自然科学版),2006(07):844-848.
上一张 下一张
上一张 下一张
计量
  • 下载量()
  • 访问量()
文章评分
  • 您的评分:
  • 1
    0%
  • 2
    0%
  • 3
    0%
  • 4
    0%
  • 5
    0%