Based on the requirement of compactivity, continuity, and high efficiency, and taking full advantage of cushion capability of flexible parts such as external refining in new generation steel plant, an output model of steel plant was established in terms of matching between BOF and caster. Using this model, the BOF nominal capacity is selected, the caster output and equipment amount are computed, and then the steel plant output is computed.
参考文献
[1] | YIN Rui-yu.Smelt Flow Engineering Science[M].北京:冶金工业出版社,2004 |
[2] | National Development and Reform Commission .Steel and Iron Industry Development Policy[R].北京:National Development and Reform Commission,2005. |
[3] | QIU Jian .The Research on Mass Flow Technology of BF/BOF Interface in Steel Manufacturing Process[D].北京:北京科技大学,2004. |
[4] | QIU Jian;TIAN Nai-yuan;LIU Mao-lin et al.The Parse on Mass Flow Parameter of BF/BOF Interlace in Baosteel Manufacturing Process[J].Journal of University of Science and Technology Beijing,2004,26(02):197. |
[5] | ZHANG Jin .The Research on the Technics and Parameter of Mass Flow of New Big Steel-Making Plant[D].北京:北京科技大学,2006. |
[6] | JIANG Xiao-dong .Research on Hot Metal Pretreatment Mode in New Generation Steel Plant[D].北京:北京科技大学,2006. |
[7] | Toshiyuki Ueki;Kiyohito Fujiwara;Noriaki Yamada.High Productivity Operation Technologies of Wakayama Steelmaking Shop[A].Chiba,Japan,2004:18. |